阿拉爱上海123vip,南京工作室外卖喝茶,东莞高端私人品茶

Cn

Introduction to the Engineering Characteristics of Subway Sleepers
Source:Qufu Juli Release Date:2020-8-18
Read:6

A sleeper beam that is directly connected to the steel rails of a subway line. Reinforced concrete is commonly used as a sleeper material. The following is an introduction to the characteristics of subway sleeper engineering:

A sleeper beam that is directly connected to the steel rails of a subway line. Reinforced concrete is commonly used as a sleeper material.

The following is an introduction to the characteristics of subway sleeper engineering:


1. Due to the long construction time span, winter cold construction and summer high temperature construction, different measures must be taken during concrete pouring construction to ensure construction quality.


2. The construction of track engineering requires the laying of seamless tracks at once, and the standard speed for passing inspection is to reach 80km/h. The track needs to have high smoothness and stability, and the construction technology requirements are very high.


3. The construction progress of offline units is inconsistent, with a total of 12 construction breakpoints, and the length of the construction breakpoints is between 200 and 400 meters, resulting in the inability to continue the construction of the track project. Only construction tools and mechanical equipment can be transported after segmented construction.


关于地铁轨枕的工程特点的介绍


主站蜘蛛池模板: 洛扎县| 小金县| 上杭县| 邯郸市| 文山县| 桓仁| 蒙阴县| 秦皇岛市| 河津市| 海林市| 剑川县| 新安县| 翁牛特旗| 定襄县| 大荔县| 大悟县| 元谋县| 蕉岭县| 凯里市| 扶风县| 桂东县| 张家港市| 尚志市| 库车县| 樟树市| 鸡东县| 灵寿县| 贺兰县| 社旗县| 潼南县| 融水| 平利县| 宜兰县| 葵青区| 斗六市| 冀州市| 巧家县| 普定县| 崇信县| 德兴市| 金秀|